Showing posts with label National Aquatic Centre. Show all posts
Showing posts with label National Aquatic Centre. Show all posts

Wednesday, April 01, 2026

Aquatic Centre Construction Begins as La Sagesse Project Remains in Planning Phase

Government outlines progress and challenges for two key sporting facilities

by Michael Bascombe

ST GEORGE’S, Grenada, April 1, 2026 – The Government of Grenada has provided an update on two major sporting infrastructure projects, confirming that construction has commenced on the National Aquatic Centre at Queen’s Park, while the proposed renovation of the La Sagesse Playing Field in St David remains in its early planning stages.

Prime Minister Dickon Mitchell disclosed that the La Sagesse project is currently in the pre-feasibility phase, noting that it is too early to establish a timeline for construction.

“Until the technical assessments are completed, it would be premature to provide any definitive timeframe,” the Prime Minister indicated, emphasising the importance of ensuring that all planning and evaluation processes are properly undertaken before advancing the project.

Meanwhile, more tangible progress is being made on the National Aquatic Centre at Queen’s Park. Chief Technical Officer Kimon Andrews confirmed that construction is already underway, with a local contractor leading the initial phase of works.

Andrews explained that the current scope of the project includes foundational work, specifically the base slab for the swimming pool, along with the development of ancillary buildings and bleachers to support the facility.

“The initial phase focuses on establishing the core infrastructure necessary for the Aquatic Centre,” Andrews noted, adding that the project is expected to evolve in phases as development progresses.

Monday, March 30, 2026

Broadcast infrastructure must be a priority in Grenada’s sporting facilities

by Michael Bascombe

There is a growing reality in Grenada’s sporting landscape that can no longer be ignored: sport is no longer confined to the spectators inside the venue. It is now a product consumed globally, in real time, through television and digital platforms. Yet, despite this evolution, the design and infrastructure of some of our key sporting facilities have not kept pace.

At both the Kirani James Athletic Stadium and the Grenada National Cricket Stadium, there are no fixed, purpose-built camera positions. This oversight continues to create challenges for broadcasters, who are often forced to improvise, occupying vantage points that were never intended for television production. The result? Obstructed views for patrons, including VIPs, and less-than-optimal broadcast quality for audiences at home.

This is not merely a technical inconvenience; it is a missed opportunity.

Broadcasting is no longer a luxury; it is an important component of modern sport. It enhances visibility,

drives sponsorship and promotes athletes. When camera positions are not strategically integrated into stadium design, the entire product suffers. Angles are compromised, and the viewer experience, arguably the largest audience of all, is diminished.

Equally concerning is the apparent lack of consultation during the planning and construction phases of these facilities. Broadcasters, former athletes, coaches, and sports administrators all bring valuable, practical input. Their lived experiences could inform decisions on sightlines, commentary positions, mixed zones, lighting, and technical infrastructure. Yet too often, these voices are absent from the conversation.

As Grenada looks ahead to future projects such as the proposed National Aquatic Centre and the continued development of the La Sagesse Playing Field in St David, there is an opportunity to correct course. These facilities must be designed with a holistic vision, one that accommodates not only athletes and spectators but also the demands of modern broadcasting.

Simple considerations can make a significant difference, including dedicated camera gantries at strategic angles; elevated, unobstructed platforms for primary broadcast cameras; clearly defined media zones; integrated cabling and power infrastructure; and commentary boxes designed for professional production.

These are not extravagant additions. They are standard requirements in today’s sporting world.

Grenada has made commendable strides in hosting regional and international events, particularly in athletics and cricket. However, if we are serious about positioning ourselves as a premier sporting destination in the Caribbean, then our facilities must reflect global standards.

The conversation must shift from building venues to building complete sporting experiences. The next generation of sporting facilities must be built with that reality firmly in focus.